Reverse hanging membrane membrane structure is a new type of sewage pool sealed by the way, due to its corrosion resistance, beautiful appearance,
Reverse hanging membrane membrane structure is a new type of sewage pool sealed by the way, due to its corrosion resistance, beautiful appearance, good sealing, large span and other advantages and is well received by the enterprise, and are widely used in the field of sewage pool sealed deodorization, including follow-up type reverse hanging membrane form, everyone is welcome, so what is the follow-up type reverse hanging membrane? What are its characteristics?
1, reduce the volume of the moving type reverse hanging film is only 1/2 of the fixed type, and the moving type reverse hanging film rotates with the pool body, can not be considered into the human design, and the fixed type needs to be considered into the human design, then the air change frequency is naturally different. According to the data, it is found that the gas volume of the fixed inverted hanging film is 4-5.5 times that of the follow up inverted hanging film.
2, anti-corrosion and durable follow up type reverse hanging film can effectively avoid deodorization equipment and corrosive odor contact, prolong the service life.
3, cost saving follow up type reverse hanging film structure can be placed sewage treatment equipment outside the covered body, avoid corrosion, reduce maintenance costs. At the same time, the following type reverse hanging film gas can directly reduce the cost of deodorization equipment. There is no need to carry out explosion-proof transformation of the mud scraper with the moving type reverse hanging film, saving the cost of transformation. At the same time, the air volume of the follow-through reverse hanging film is only 20%-25% of that of the collecting hood of the same size sewage tank, which can reduce the investment of waste gas treatment equipment.
4, high safety because all the equipment of the reverse hanging film of the follow up sewage tank are outside the sealing cover, operation and maintenance personnel do not have to enter the sealed body to operate, greatly improving the safety; If the fixed seal is used, the internal long-term treatment is sealed, the concentration of toxic gas is very high, the operator enters the internal operation or maintenance risk factor is very high;
The usage rate of reverse hanging membrane covering in sewage tanks is increasing now. So, what risks can reverse hanging membrane covering in sewage tanks avoid? Let's take a closer look together.
With the progress of science and technology and the popularity of the concept of environmental protection, gas film building, as an innovative form of building, is gradually favored by people.So, when choosing a gas film building, what advantages should we pay attention to?
In recent years, ozone pollution has become a difficult problem affecting the improvement of atmospheric environment quality. As one of the main precursors of ozone formation, VOCs pollution control is an important topic for the "14th Five-Year Plan" PM2.5 and ozone collaborative control. Where is the difficulty of VOCs pollution control?
Inflatable membrane football stadium belongs to the indoor football field, the main structure adopts membrane structure design, the principle is the same as that of large balloons, due to the difference in internal and external pressure of the membrane structure, the tens of tons of membrane structure expands, and the surrounding is connected with the ground and anchored by steel cables and concrete ground, forming a tight air support structure, which can be built in the shortest time.
Shanghai Zhanji Fabric Structure Co., Ltd. is a professional membrane structure vendor who has an expert engineering design and construction team, and are at the leading position in this membrane field all over China.